As we say goodbye to our wall we are anticipating the next steps. We will be working over the next couple months to prepare the remaining aspects of this project. This includes the construction of the foundation and floor slabs in China; damper construction; assembly of the building; and shake table testing. Testing is expected to happen in November.
I will keep you all posted through email and through our website: https://smartstructures.civil.ubc.ca/ilee-eerf-collaboration/
Lab in China, Tongji University: http://www.ilee-tj.com/En/Data/View/816